Machine Tool Ecosystem

Reduction ‪Adapters and Risers

Reduction ‪Adapters and Risers

Expand Your Versatility

Reduction adapters and risers expand the versatility of the SCHUNK VERO-S zero-point clamping system by elevating or adapting fixtures to the optimal height by raising the workpiece or fixture. This minimizes interference from surrounding contours and compensate for different clamping heights, which is especially valuable in multi-axis (5-axis) machining. Each adapter locks into the zero-point base with the same precision and rigidity as a standard clamping module, so even elevated parts remain securely and accurately positioned.

Machine Tool Ecosystem

Reduction Adapters and Risers

Showing 7 of 7 models
Loading...
Product ID3D CAD
SBA-VL-P 50-M16
SBA-VL-PA 50-M16
SBA-VL 25-M12
SBA-VL 50-M12
SBA-HE 50-75
SBA-VLK 75-M10
SBA-SEZ ER50-100
0 models selected

Your Selection

Each model below is routed to the best next step based on availability.

$
$
$/yr
?
?
Total Investment?
—

Labor & Staffing

Operator Staffing

?
?
wks
Machine-to-Operator Ratio: Currently — → Projected —
Current Labor Hours?
—
—
Current Labor Cost?
—
—
Projected Labor Savings?
—
—

Machines

?
#
hrs/wk
$/hr

Downtime

?
hrs/mo
hrs/mo
%
0–100% reduction in downtime

Scrap & Rework

?
$/yr
%
%
0–100% reduction in scrap rate

Setup & Changeover

?

Setup work is often performed while a machine is still running. Reducing setup time may reduce labor effort, but it only creates additional productive machine-hours if setup requires the machine to stop.

Changeover Types: 0 | Total Setup Time: 0 hrs/wk

Automated/Lights-out

?

Automated/Lights-out hours are never counted at the same time as staffed hours. If automation mainly reduces how closely operators must attend machines (without increasing total productive machine-hours), the financial impact should show up in Labor Savings, not here.

hrs/wk
hrs/wk

Reality Adjustments

?

Recovered machine-hours only become real dollars when filled with production. Capacity Realization lets you discount the value if demand isn't there yet.

%
Value Gains from Downtime Reduction?
—
Value Gains from Scrap Reduction?
—
Value Gains from Setup Time Reduction?
—
Value Gains from Implemented Automation?
—
Investment—
Annual Net Savings—
Payback—
5-Year Net—
From the Resource Hub

Related Content

Finding the Right Tombstone is Easy with Hennig
Blogs Workholding Product Selection

Finding the Right Tombstone is Easy with Hennig

Read our handy guide on how to select the right tombstone from their wide range of products.

Ready to Rock! - Epoxy Mineral Tombstones
Blogs Workholding Product Selection

Ready to Rock! - Epoxy Mineral Tombstones

Dr. Tony Schmitz, a professor specializing in vibration analysis, came to AME to do a series of tests on the various material types of tombstones and breaks down his findings to determine the best type of tombstone for your shop.

Why You Should Consider Off-Machine Setups for Your Machining Process
Blogs Workholding Product Selection

Why You Should Consider Off-Machine Setups for Your Machining Process

If you want to reduce your overall costs and increase your flexibility to meet your customers’ demands, consider incorporating off-machine set-ups into your machining process.